Thursday 24 November 2011

PLastered

A busy week for the house with the plasterers going flat out all week to complete ready for the painters on Monday. The skirting boards and some of the coving have now being installed ready for painting next week.


The family room, dining room kitchen area is finished ready for painting. Cardboard on the floor to protect the polished concrete


As is the entrance way and hall


Front door still to be installed, otherwise already for painting.


The Garage door (fully insulated) has been installed, just leaving the front door to arrive. The front door has to be specially made because of the height... must be for tall people to get in the door.


Whiteware is starting to be installed in the two bathrooms with the shower trays in, more to go in next week. The holes in the bathrooms have now been cleared for the plumbing and this photo shows the structure of the floor, with the concrete floor slab and then the polystyrene layer above the heat bank.

Next week will see outside the foundations plastered; the roof finished off along with the gutters and down-pipes, the ground all leveled off for decks, lawns, paths and driveway; the deck started, the lawn mowing strips going in and the concrete drive and paths poured and completed.

On the inside we will see painting well advanced, the electrical switchboard installed and the garage finished off with access into the roof.

Just 3 weeks to go