Sunday 5 February 2012

Water Feature

Well the house is now nearly finished with the photo voltaic system switched on and generating power, the DSHH system solar water panels installed on the roof and this week the system should be finally connected and balanced.

The landscaping water feature is now finished with the solar pump working well to recycle the water. The water ponds and creeks have had four sealing coats on Cemix blue resin and then topped off with a coat of grey concrete paint. The water plants are now all in the ponds and the system was switched on at lunchtime today and worked as intended.

See the attached video at http://www.facebook.com/video/video.php?v=10150652431294602&saved



The front of the house is now all finished, the garage all cleared out and cleaned up and cars now parked in the right place.


The lawn is also ready for its first trim with the over-sow working really well. Letter box up and in place and can now start to think about putting my feet up on the deck with a glass of cool beer..
Watch out for the results of the systems in the weeks ahead.

No comments: