Monday 15 August 2011

Initial Site Works

The site as it was prior to the initial levelling of the site.

Work commenced on the 18th July with the cutting and levelling of the section ready for the initial ground works.

This shot shows the cut for the retaining walls needed to level the site and retain the fence on the high side of the site.